This project marks a significant milestone in my life and serves as a strong foundation for my career. While it’s difficult to capture every detail here, it’s worth noting that this endeavor occupied an entire year during my time at Tsinghua University in Beijing. My leaders and colleagues highly valued my dedication to such a large-scale public project, and I deeply appreciate the opportunity to have been part of it during my first year of work, right after graduation.
Contribution to this project not limited to:
99% model work in Rhino & Grasshopper
Schematic Design (SD):
Early research and modeling for building morphology
Support drawings in biding document
Design Development(DD):
Walking system design (connecting platform)
Facade system design and details development, not limited to:
- Curtain (wall) design
- Shading and louvers system design
- Surface optimization and panel unit division
- Column grid optimization
- Double-layer roof and drainage system
- Conection between cladding and main body
First-hand structure design, collaborate with structural engineer
Support energy system report
Support drawings in biding document
Construction Document (CD):
Collaborate with BIM department to remodel in Revit…
2D drawing of facade and colorful master plan…

Working model of main stadium

Working model of indoor stadium

Working model of swimming stadium